XR3D-6 Maintenance & Troubleshooting
EM-XR3D-6-001-EN.D
6-1
©2011 VOTI Inc.
6 R
EMOVE AND
R
EPLACE
P
ROCEDURES
An authorized technician performs an X-ray radiation test after each maintenance task
where the XR3D-6 has been opened.
The front of the XR3D-6 is denoted by the location
of the Operator Key Switch (E).
A. Front
B. Back
C. Left - Conveyor Motor (Tunnel Entrance)
D. Right - Conveyor Idler (Tunnel Exit)
E. Operator Key Switch, Keypad, & USB slot
Before any maintenance is performed,
always make sure that the power is turned OFF, preferably at the wall receptacle and at the
UPS.
Attach a Do Not Operate tag to the AC plug or the Operator Key Switch. Do not touch the
terminals or other current-carrying ports while power is being supplied. Electric shock may
occur.
6.1 Access Items in the Base
To access the XR3D-6 source, UPS, Power Distribution Unit, and Conveyor Motor Controller,
remove the front or rear access panels.
To remove the access panels, front or rear, proceed as follows:
1. Unscrew the M6 x 25 SS machine screws with a 6 point security head. Depending on the
model, there are either four (4) or (2 at the top and two at the bottom) or just two (2) at the
bottom.
Содержание XR3D-6
Страница 2: ...XR3D 6 Maintenance Troubleshooting ii EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 5: ...XR3D 6 Maintenance Troubleshooting EM XR3D 6 001 EN D v 2011 VOTI Inc 7 XR3D 6 Safety Features 7 1...
Страница 6: ......
Страница 20: ...XR3D 6 Maintenance Troubleshooting 2 8 EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 32: ...XR3D 6 Maintenance Troubleshooting 3 12 EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 48: ...XR3D 6 Maintenance Troubleshooting 3 28 EM XR3D 6 001 EN D 2011 VOTI Inc...
Страница 52: ...XR3D 6 Maintenance Troubleshooting 4 4 EM XR3D 6 001 EN D 2011 VOTI Inc...