C H A P T E R 5
–
G E T T I N G S T A R T E D
AT5600 User Manual 98-119 issue 14
Page 64
Now, connect the windings to the test nodes of the tester:
Place the mouse pointer over terminal A; press and hold the right mouse button.
Continue holding the mouse button down and drag the mouse pointer to test node
9. Release the button. A wire will now connect terminal A to test node 9. Repeat
this procedure to connect the other three terminals, B, C and D to nodes 7, 10
and 8. The screen should now look like this:
You have now created a schematic layout of a four-terminal transformer.
5.4.2.
Creating the Test Program
After creating the transformer schematic, you may now create an example
program, containing the following four tests:
Resistance of winding AB (1 M
to 209 m
)
Resistance of winding CD (171 m
to 209 m
)
Inductance of winding AB (>330 uH)
Turns ratio AB to CD
(1:1
2%)
Содержание AT5600
Страница 10: ...AT5600 User Manual 98 119 issue 14 Page 10 16 4 AT Series Server Software 437...
Страница 39: ...C H A P T E R 2 S Y S T E M O V E R V I E W AT5600 User Manual 98 119 issue 14 Page 39...
Страница 88: ...C H A P T E R 6 S A F E T Y S Y S T E M S AT5600 User Manual 98 119 issue 14 Page 88...
Страница 168: ...C H A P T E R 7 T E S T S A N D T E S T C O N D I T I O N S AT5600 User Manual 98 119 issue 14 Page 168...
Страница 198: ...C H A P T E R 8 F R O N T P A N E L O P E R A T I O N AT5600 User Manual 98 119 issue 14 Page 198...
Страница 204: ...C H A P T E R 9 T R O U B L E S H O O T I N G AT5600 User Manual 98 119 issue 14 Page 204...
Страница 252: ...C H A P T E R 1 0 S P E C I F I C A T I O N S AT5600 User Manual 98 119 issue 14 Page 252...
Страница 258: ...C H A P T E R 1 2 W A R R A N T Y A N D S E R V I C E AT5600 User Manual 98 119 issue 14 Page 258...
Страница 270: ...C H A P T E R 1 3 T E S T F I X T U R E S AT5600 User Manual 98 119 issue 14 Page 270...