Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
– Attach lifting tackle -2024 A- as shown and lift from engine and
gearbox jack -VAS 6100- using workshop crane -V.A.G 1383
A- .
Caution
Use securing pins arrows on hooks and locking pins to avoid
damage to engine.
– Secure engine to engine and gearbox support -VAS 6095- .
1.3
Notes on installing
Special tools and workshop equipment required
♦ Vehicle diagnosis, testing and information system -VAS
5051B-
Procedure
Install in reverse order. In the process, note the following:
Caution
♦ Only a few millimetres of space are available between
plenum chamber and radiator/lock carrier for removing
and installing the engine. The engine must therefore be
guided carefully when raising and lowering.
♦ Raise and lower the engine slowly with the assistance of
a second mechanic.
♦ The workshop hoist -VAS 6100- must also be guided care‐
fully when raising and lowering the engine.
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
14
Rep. gr.10 - Removing and installing engine