Parts List:
2 Toepieces
2 Heel Pads
2 Heel Pad spacers
4 Heel Pad Plugs
4 Cables and 2
Heel pieces
(assembled)
10 Mounting Screws
(5/8”/16mm posi-drive)
Congratulations on the purchase of a pair of Voilé 3-Pin Cable bindings. It is a reliable,
lightweight, time tested piece of Voilé equipment.
3-Pin Cable Instructions
3-PIN CABLE
TELEMARK BINDINGS
Mounting
Voile recommends an authorized dealer for all binding mounts
Following ski manufacturer guidelines, determine 3-Pin Line position on ski.
Use the Voile Mounting Jig or the enclosed paper jig and a 3.5mm x 9.5mm bit to drill the ski. For metal top sheets use a
4.1mm x 9.5mm bit and be sure to tap the holes. Check the bit depth before drilling, especially for narrow profile skis.
Check the screw length to prevent “dimpling” the base, grind the screws if necessary. Mount the binding directly on the ski
using wood glue or epoxy in each screw hole, according to ski manufacturers guidelines.
Insert boots into toepieces, and check that the left boot is in the left toepiece and vise versa. Center the heel pad under
the telemark boot heel. The thin spacer is mounted between the heel pad and the ski top sheet. This will protect the top
sheet and prevent a climbing wire from scratching the top sheet. Mark the location of each heel pad, then mark the holes.
Drill the holes, check the screw length and grind the screws if necessary. Mount the heel pad and heel pad spacer. Install
the heel pad plugs by tapping them in with a small hammer.
voile.com