![Vogelsang VX Series Скачать руководство пользователя страница 72](http://html.mh-extra.com/html/vogelsang/vx-series/vx-series_manual_1044344072.webp)
Rotary lobe pump
Operating instructions
VX100Q, VX136Q..QD..QDM2, VX186Q..QD..QDM2, VX230Q..QD
28/68
7.2.2
Depressurised quenching fluid tank
The quenching fluid tank must always be a quarter full with quenching fluid to allow for thermal expansion.
The level of quenching fluid in the tank can vary because of operational conditional heating of the pump.
Unscrew the upper housing of the quenching fluid tank to top up the tank (hold the union nut tight so that the
lower screw connection does not come loose).
6
Hexagon head screw plug
(
installation tightening torque: 60 Nm
)
7
Quenching fluid tank
A
Filling
B
Emptying
Fig.
17
: Pump with quenching fluid tank, without pressure valve
Содержание VX Series
Страница 1: ...Best Practices for Installation of VX Rotary Lobe Pumps WELCOME TO VOGELSANG FACTORY TRAINING ...
Страница 6: ...Follow all best practices for safety when working on Vogelsang Equipment Preparing for Installation ...
Страница 15: ...Installation ...
Страница 24: ...Pressurizing the Pump ...
Страница 36: ...Direction of flow Startup Checklist Startup ...
Страница 44: ......
Страница 121: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 122: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 123: ...Service Manual Service Manual Pump Models VX Series Q Pumps ...
Страница 133: ...Service Manual Service Manual Pump Models VX Series Q Pumps Operational Startup Testing continued ...
Страница 189: ...Service Manual Service Manual Pump Models VX Series Q Pumps Warranties 4 A 1 Warranty Information ...
Страница 191: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...
Страница 192: ...Service Manual Service Manual Pump Models VX Series Q Pumps 5 A 1 Documents for Testing at Initial Startup continued ...