DP 2310 Wi-Fi Switch System
Guide
Created on 12/3/2002 11:45 AM
3.3
Installation Notes
3.3.1
Primary Tools
The following tools may be required during installation:
•
User guides and installation manuals for all equipment
•
Hand tools
•
RF Power Meter
•
Spectrum Analyzer
3.3.2
Other Equipment
The following equipment may be required during installation:
•
Mounting hardware
•
Antenna Grounding Kit
3.3.3
Installation Site Survey
Installation site surveys should be performed by Vivato personnel. The first step in installing the
DP 2310 Wi-Fi Switch is the site survey. Antenna locations must be reviewed for minimizing potential
RF energy human exposure levels and for adherence to Maximum Permissible Exposure (MPE) RF
Radiation Hazard distances, as well as minimizing any potential co-site radio interference issues. Routing
of power and Ethernet connections should also be planned at this step.
3.3.4
Installation Safety and Equipment Warnings
NOTE:
Only qualified Vivato installers shall install the DP 2310. Installation by any other personnel
will void the product warranty. Vivato Inc., its agents, resellers, or distributors, are not liable for injury,
damage, or violation of government regulations that may arise from failing to comply with the guidelines
described in this document.
WARNING:
The Vivato DP 2310 Wi-Fi Switch is designed for mounting in open areas. The
antenna must be installed with at least 2 meters clearance from areas generally occupied by people
over an extended period of time.