
SECTION 4: INSTALLATION REFERENCE
48
EPI800 Manual.doc
EPI 800 MANUAL
2001 Vision Microsystems Inc.
FIGURE 5: DPU P1 Cable Preparation
Foil & plastic
removed.
Shield removed.
Jacket removed.
Pins crimped to wires.
(See APPENDIX G
for Dsub pin crimp
tool.)
Heat shrink applied.
Shield wire junction
soldered to cable.
Shield wires soldered.
Содержание EPI 800
Страница 3: ......
Страница 4: ......
Страница 8: ......
Страница 22: ......
Страница 50: ......
Страница 54: ...SECTION 4 INSTALLATION REFERENCE 46 EPI800 Manual doc EPI 800 MANUAL 2001 Vision Micr FIGURE 3 DPU MOUNTING ...
Страница 76: ...SECTION 4 INSTALLATION REFERENCE 68 EPI800 Manual doc EPI 800 MANUAL 2001 Vision Micr ...