vicosys
®
5400
Commissioning
© Vision & Control GmbH 2017
999.994.729.10-en-2.3
53
6.3.9 Connecting and switching on the operating voltage
NOTICE
Destruction caused by potential differences.
•
Ensure that the device is properly grounded (equipotential bonding).
Connect the operating voltage
The operating voltage is supplied via the 3-pin operating voltage connector
(scope of delivery) on the device.
CAN 2
CAN 1 / Serial 2
LED
CAN 1
CAN 2
LED
- R
+
V
D
C
CFAST
HD PWR
RST PWR
I/O
1
+V
DC
GND
Image 21: Operating voltage connector
(1)
Operating voltage connector
1. Ensure that the power supply is switched off.
2. Unscrew the operating voltage connector from the device.
3. Connect the positive voltage (plus) to +V
DC
and the negative voltage
(ground) to GND.
Pin
Signal
Description
1
+ V
DC
Operating voltage
2
NC
Do not use
3
2
1
3
GND
Ground
4. Plug the operating voltage connector to the device and tighten the screws.