VinylWorks SD Скачать руководство пользователя страница 2

Step 2  -  Attach Brace Supports 

Identify  &  sort  braces  by  length.  There  are  six  medium  (M),  two  short  (S) 
and  one  special  (*)  braces  (see  2.1).  Separate  five  3/8"  x  1"  long  bolts  & 

3/8" small  washers  &  nuts from  hardware  kit (see 2.2).  Lay  deck  platform 
face down & position braces (see 2.3). Two braces are secured to one bolt    
position  and  identified  by  the  circles  (see  2.3  &  2.5).  Fit  bolt  (+  washer) 
through the large hole in end of the braces and through hole on steel frame 
(see  2.4  &  2.5  &  2.6)  Secure  using  washer  &  nut  from  bottom.  Tighten   

hardware  to  snug  only.  DO  NOT  ATTACH  THE  SPECIAL  BRACES  UNTIL 
STEP 9. 

2.2 

Step 3  -  Position & Attach Long Support Posts 

2.6 

2.3 

Select  all  five  96"  long  support  posts  (see  3.1).  Note  each  post  is 
marked  with  direction  arrow  (see  3.2).  Stand  deck  platform  with 

braces on it’s edge so the back legs are towards the  left (see 3.4). 

From bottom to top of platform, fit a support post through the post 
hole  in  platform  (see  3.3  above).  Start  with  the  post  towards  the 
bottom  (see  3.4  - 

post  hole  “A”).  Make  certain  the  direction  arrow 

and hole in the post is facing the bolt hole in the platform frame (see 

3.5).  Position  the  post  so  the  hole  in  the  post  is  centered  with  the 
bolt  hole  in  the  frame (see 3.6).  Using  a  post  spacer (see  3.7)  & a 
3/8" x 6" bolt and washer (see 3.8), position spacer between post & 
frame & pass bolt through holes in frame, spacer & post (see 3.9). 
Secure  only  finger  tight  using  washer  &  nut  so  post  can  move 

slightly  (see  3.10).  With  deck  still  standing  on  edge,  repeat  above 

procedure for support post  located at position “B” in 3.4 above.

 

3.3 

3.4 




3.2 

3.5 

3.7 

3.8 

3.6 

SPACER 

3.9 

3.10 

3.1 

2.5 

Step 1  -  Organize & Get Ready for Assembly - Separate Hardware & Identify 

Your  pool  deck  is  packaged  in  five  cartons  total.  Familiarize 
yourself  with  all  components  (see  parts  layout  on  page  1). 

Open  the  hardware  kit  (bag)  and  arrange  hardware  bags, 
parts and pieces. Most hardware is individually packaged and 
labelled for easy identification (see 1.1). NOTE: the pool steps / 
cartons  (boxes  2  &  4)  include  hardware  as  well.  Follow      
hardware layout included for proper identification and usage. 

A measurement guide on the hardware layout can be used to 
verify length. All hardware included is 18.8 stainless steel (302
-304 stainless) except the gate latch & striker bar. 

1.1 

2.1 

2.4 

Содержание SD

Страница 1: ...cked when the pool is not in use AT ALL TIMES Lock not included Locate the ground to deck entry system on a solid base for greater stability away from high traffic areas Secure both entry systems to deck for stability and safety as per instructions Keep handrails and treads of both step systems free from obstructions to avoid possible injury Do not secure any items to the step systems Such objects...

Страница 2: ...le in the post is facing the bolt hole in the platform frame see 3 5 Position the post so the hole in the post is centered with the bolt hole in the frame see 3 6 Using a post spacer see 3 7 a 3 8 x 6 bolt and washer see 3 8 position spacer between post frame pass bolt through holes in frame spacer post see 3 9 Secure only finger tight using washer nut so post can move slightly see 3 10 With deck ...

Страница 3: ...to make sure post is plumb in opposite direction see 4 6 drill pilot hole through eye of brace see 4 7 Secure using a screw washer as in 4 5 Repeat procedure for support post in position A see 4 1 Step 3 previously Make certain all screws are tight into posts Once braces securely in place tighten post bolts 3 8 x 6 from Step 3 3 9 3 10 4 6 4 7 Step 4 Secure Braces to Posts 4 4 4 2 4 3 4 5 4 1 B A ...

Страница 4: ...Pool Position deck against pool at desired location The front of the deck is designed to cantilever the top rail of the pool sufficient only to prevent stepping on top rail to eliminate gap between deck top rail see 9 1 1 9 3 The front edge of the deck should not protrude past the inside face of the top rail It is IMPORTANT to leave a 1 to 1 gap between the top rail of the pool the underside of th...

Отзывы: