background image

1. 

Assemble frame

 - Thread footer pads into the bottom of the 

uprights. Lay down one upright and attach all three crossrails using 
the provided crossrail assembly screws in predrilled mounting holes. 
Do  not  fully  tighten  to  allow  for  adjustments  during  assembly. 
Standing  first  upright  up,  attach  second  upright  to  crossrails.

2. 

Attach racks to frame

 - Using two base cradling racks, and 

starting on the left side of the assembled frame, align the mounting 
holes  in  racks  with  the  holes  on  crossrails.  Temporarily  place 
alignment tool through center hole in first rack, crossrail and the 
center hole in second rack, as shown. Attach racks to crossrails as 
shown. After securing top and bottom of racks, remove alignment 
tool and replace with assembly screw. Repeat for each rack set, 
alternating between base and neck sets.

IDR Extension packages contain only 1 IDRx-UPRIGHT and 2 footer pads.

Hardware shown 

actual size

6 X

WS33

or

WS43

4 X

Footer Pad

3 X

IDR-CR3

1 X

IDR-PR

2 X

IDR3-UPRIGHT 

or

IDR4-UPRIGHT

12 X

Crossrail Assembly 

Screw

3 X

IDR-PR Assembly

Screws

18 X

WS Assembly 

Screw

2 X

IDR-PR Assembly Bolt

4 X

IDR-PR Assembly 

Washer

Required tools:   IDR-AK - included with IDR and contains an   
 

 

 

8mm Nut Driver and Alignment Tool

 

 

Electric Screw Driver with #2 Phillips Bit

 

 

2 X 14mm (or adjustable) Wrench 

Island Display Rack (IDRx) Assembly Instructions

Wine Master Cellars, LLLP • 10645 E 47th Ave, Denver, CO 80239 • phone: 866.650.1500 • fax: 866.650.1501 • VintageView.com 

Отзывы: