1.
Assemble frame
- Thread footer pads into the bottom of the
uprights. Lay down one upright and attach all three crossrails using
the provided crossrail assembly screws in predrilled mounting holes.
Do not fully tighten to allow for adjustments during assembly.
Standing first upright up, attach second upright to crossrails.
2.
Attach racks to frame
- Using two base cradling racks, and
starting on the left side of the assembled frame, align the mounting
holes in racks with the holes on crossrails. Temporarily place
alignment tool through center hole in first rack, crossrail and the
center hole in second rack, as shown. Attach racks to crossrails as
shown. After securing top and bottom of racks, remove alignment
tool and replace with assembly screw. Repeat for each rack set,
alternating between base and neck sets.
†
IDR Extension packages contain only 1 IDRx-UPRIGHT and 2 footer pads.
Hardware shown
actual size
6 X
WS33
or
WS43
4 X
†
Footer Pad
3 X
IDR-CR3
1 X
IDR-PR
2 X
†
IDR3-UPRIGHT
or
IDR4-UPRIGHT
12 X
Crossrail Assembly
Screw
3 X
IDR-PR Assembly
Screws
18 X
WS Assembly
Screw
2 X
IDR-PR Assembly Bolt
4 X
IDR-PR Assembly
Washer
Required tools: IDR-AK - included with IDR and contains an
8mm Nut Driver and Alignment Tool
Electric Screw Driver with #2 Phillips Bit
2 X 14mm (or adjustable) Wrench
Island Display Rack (IDRx) Assembly Instructions
Wine Master Cellars, LLLP • 10645 E 47th Ave, Denver, CO 80239 • phone: 866.650.1500 • fax: 866.650.1501 • VintageView.com