7602026
19
ONLY FOR STOCK GUIDE:
- Pass the power supply cable inside the spiral
tube and fix with the proper fairlead to the lid by
the top side of the guide (after having removed
the feather of the down side of the lid) (Fig.9/e).
- Drill with Ø 6 the chain carriage profile close to
the guide connection and fix with the proper self-
threading screws 4,8x13 (Fig. 9/c).
3) INSTALLING THE CARRIAGE
- Bring the carriage unit to the upper floor then remove
the mechanical limit stop buffer on the top end of the
rail.
- Assemble the cover and the plate with the proper
self-threading screws 4,8x13, on the guide at high side.
- Fix the cable carriage plate to the carriage (facing in
the down direction) using suitable screws (Fig. 12/c).
- At this point, check that the safety gear hook is
horizontal (Fig. 12/e) and that the pins (Fig. 12/a - Fig.
12/b) are vertically aligned (using a spirit level).
N.B.: Each system will carry a card listing the
operations to be carried out.
- Engage the safety gear hook to prevent undesirable
movements when the lift structure is fitted.
4) COMPLETE ACTUATOR ASSEMBLY
1) Assemble the actuator (Fig. 13/a) with nut (Fig. 13/
b), washer (Fig. 13/c) and friction (Fig. 13/d) paying
attention that the release friction must result opposite
to the machine and check the quote 271 mm (vedi Fig.
13) when the actuator is closed (therefore on the op-
posite side of the micros of the actuator itself).
2) On the support (fork) insert the two rubber pieces
(vibration-damping) (Fig. 14/b), then screw the actua-
tor (Fig. 14/e) with a TE M10x90 screw (Fig. 14/a), a Ø
UNI 6593 washer (Fig. 14/c) and M10 self-locking nut
(Fig. 14/d) (it is advisable doing this before as the frame
is obstructing the field).
Please Note: screw till placing the rubber spacers
at support level.
3) Screw into the frame (on the machine low side) (Fig.
15/c) with M10x30 screw (Fig. 15/a) and Ø 10 washer
(Fig. 15/b).
4) Release the friction (Fig. 16/a).
5) Bring the friction tube (Fig. 17/a) at the same level
as the support holes (Fig. 17/b) and fix with TE M8x50
screw (Fig. 17/c) and thread-locking adhesive.
5) FITTING THE LIFT BODYWORK
- Bring the lift bodywork towards the carriage, trying to
align it with the carriage sprocket.
- Connect the connectors of the cable carrier chain
driver:
(blue cable 4 x 1 for power supply)
(green cable 8 x 0,35 for control board) (optional)
FIG.12
a
e
b
f
g
d
h
c
FIG.13
a
b
c
d
FIG.14
b
b
e
a
c
c
d
274
0 -0,5
Содержание V64 B.C.
Страница 2: ......
Страница 30: ...29 6 4 2 3 5 9 13 14 14 10 18 16 19 15 11 12 17 28 20 25 26 27 24 7 8 23 8 22 21 24 1 TELAIO 7801105...
Страница 32: ...31 1 2 3 4 5 6 6 7 8 9 10 11 12 13 12 13 14 14 16 15 17 18 19 20 15 PEDANA 7801106...
Страница 34: ...33 BARRE DI SICUREZZA 7801189...
Страница 37: ...36 BARRE DI SICUREZZA RETRATTILI 7801190...
Страница 40: ...39 SOLO PER MOD V64 SOLO PER MOD V74 PROTEZIONI 7801110...
Страница 42: ...41 6 9 8 7 10 4 3 5 4 4 1 2 11 13 14 12 5 3 5 3 GUIDA 7801111...
Страница 44: ...43 3 2 9 6 7 1 5 6 4 8 8 9 10 8 PANNELLO ELETTRICO B I 7801108...
Страница 46: ...45 3 2 9 6 7 1 5 6 4 8 8 8 9 9 PANNELLO ELETTRICO B C 7801109...
Страница 48: ...47 CAVIAZIONAMENTO PEDANA BANDELLA 7804457 1 2 BARRE RETRATTILI BARRE COLLEGATE BARRE INDIPENDENTI 3 4...