Installation
P.22
7.5 Installing the toilet
Follow the installation specification to fix the toilet as deteiled in the following steps. After completition,
connection between the connecting wire and toilet's connector should be made and screwed tightly. Orga-
nize extra exposed connecting wires.
Mark the installation positions:
1
Wall
2
Toilet contour stencil
3
Position of the soil pipe
4
Position for the ground screws
5
Floor flange contour
1. Mark the installation positions for the ground screw, the contour of floor flange and the toilet.
Using a marker pen with the installation stencil.
2. Remove the installation stencil.