background image

Figure 10: Fastening the Roof Cover

First circle the band for tie
down ratchet(part#34) around
the tensioning tube through the
cuts on the pocket of the roof
cover.

Step #6 --TENSION COVER ON

FRAME FROM SIDE-TO-SIDE

As Figure 10 shows, when Roof Cover is over top
of Frame Assembly, insert Cover Tensioning
Tubes into pockets along both sides of Roof

Cover. Center Roof Cover over Frame assembly

both side to side and front to back. Align one side

of Roof Cover evenly front to back. Add Band for
Tie Down Ratchet at each point along the cover
opening, as shown. Put Band for Tie Down
Ratchets over Cover Tensioning Tubes at each
Base Plate along one side. Bands do not attach to
Tensioning Tubes, but loop around and secure at

both ends on ratchet.

Next take up slack in tie bands by ratcheting the
mechanisms, tightening cover. Evenly adjust
ratchets on both sides of roof cover to take
wrinkles out of roof cover. DO NOT fully tighten

cover yet. Leave adequate slack so that cover can
also be adjusted front to back in next step.

Step #7 --TIGHTEN ROOF COVER
ON FRAME FRONT TO BACK

The roof cover is tensioned from front to back by
the rope lacing to grommet flaps inside the main
cover, inside the unit at both front and rear arches.
Using the rope provided, lace the main cover
grommet flap around the main frame front and rear
arch pieces. Start in the top middle of each arch, and
lace to each side. Add rope length by tying pieces
together or cutting as necessary.

Lace all grommets on cover inside flap with rope.

Starting at the middle top point over the door,

tighten lacing only enough to take wrinkles out of
the cover. Repeat for the Rear Arch. DO NOT over
tighten lacing to pull out the grommets.

After the roof cover lacing is adjusted evenly across
the grommet flap, go back and re-adjust the
Tensioning Ratchets along the side edges of the
Roof Cover. At this point, the main cover can be
pulled taut enough to take all excess material and
wrinkles out of cover. It will be necessary to repeat
this step 2-3 weeks after unit assembly is complete
and roof over has a chance to stretch out over the

frame completely.

Before inserting the cover tensioning
tube(part #19) into pocket of roof
cover, you need to make cuts for band
of Ratchet on the cover  first. Firstly
please draw the outline of the cuts
according to the position of Ratchet.
The position of cuts should be right
upon the ratchets.

draw the outline of cuts

Then make the cuts using
forfex along the outlines.

24

34

19

Then put the bands through
the reel of the ratchet, and
tension the band by ratchet.

b

a

c

d

36

Содержание JIT-2340J

Страница 1: ...SHELTER MODEL JIT 2340J L12 0xW7 0xH4 8m Assembly Manual www vikre no...

Страница 2: ...snow drifts n slippery places or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a punctur...

Страница 3: ...me and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc Be taken off and the cover will not be blocked during the way Avoid taking off the cover with h...

Страница 4: ...late at front panel 2 9 Base plate at back panel 2 10 Door beam 2 11 Upper door track 2 12 Lower door track 1 12A Lower door track to connect the lower beam 1 13 Upper beam of front panel 2 13A Lower...

Страница 5: ...de cover beside the door 2 34 Band for tie down ratchet 14 35 Rope for fastening the two ends of roof cover the front door back cover 11 36 Plastic cap for tensioning tube 6 4 37 Door dropping tube in...

Страница 6: ...1 2B 3B 2 3 4 5 6L 6R 7R 7L 8 9 10 11 12 12A 13 13A 14 15 16 17 20 21 3B 25 2B 4 26 Figure 1 Sketch of JIT 2340J 2A 28 11 2A 3A 3C 5A...

Страница 7: ...l the components from packaging to ensure all components are present by checking with the Part List 6L 6R 2 0m 2 0m 2 0m 2 0m 2 0m 2 29m 7R 8 3 7m Diagonals are equal 12 0m 2 0m FRONT 7m 7L 9 1 65m 1...

Страница 8: ...nel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts completely until frame is f...

Страница 9: ...ly continues Next stand first interior arch up to repeat insertion into Base flanges Immediately after putting first interior arch into place connect Front Arch and Interior arch using Roof Purlin Tub...

Страница 10: ...ady to install Roof Cover unpack cover and lay parallel to building frame on one side Cover must be pulled over top of frame assembly without being snagged or stressed on any frame members Use multipl...

Страница 11: ...the unit at both front and rear arches Using the rope provided lace the main cover grommet flap around the main frame front and rear arch pieces Start in the top middle of each arch and lace to each...

Страница 12: ...Figure 11 Fastening the two ends of the Roof Cover Figure 12 Installation of the Front Cover Figure 13 Installation of the Back Cover 33 32 31 35...

Страница 13: ...cket on one side The rope ties off to the loop that is located on the Base Flange in Corner part 6 Moving to the other side begin to pull the rope down Hold the rope in hand and push down at the botto...

Страница 14: ...t install the steel wire that leads from the bottom of the door dropping tubes to the door winching assembly Take one of the Steel Wires in the Door kit and feed down from the top of the Door track to...

Отзывы: