ALIGNMENT AND TEST PROCEDURES
7-11
October 1999
Part No. 001-2009-201
Figure 7-9 RECEIVER TEST SETUP
U406
Y40
1
R425
U402
U405
J401
2
1
19
20
R446
U404
L404
2
1
19
20
R264
R261
U206
Z213
L225
L211
L209
L207
U207
Y201
L223
L224
L206
L205
L204
L203
L202
L201
L220
U209
J201
J402
U403
PIN 6
RFIB
COMMUNICATIONS
SERVICE MONITOR
20
dB
TM
OCXO 2
DELTA F
OUTPU T
AC
D C
OCX O1
O CXO 2
INTERRU PT
OCXO 1
INTERRUPT
INTERRUPT
DC BACKUP
R284
L231
HP 334A
OSCILLOSCOPE
AC
VOLTMETER
VOLTMETER
DC
FREQUENCY COUNTER
AUDIO DISTORTION
ANALYZER
16 OHM
POWER CABLES
36-PIN RIBBON CABLE
1.25 MHz
TP3
TP4
TP6
TP5
TP1
TP2
Содержание VX 900 MHz LTR
Страница 2: ...1 2 October 1995 Part No 001 2008 202...
Страница 4: ...1 4 October 1995 Part No 001 2008 202...
Страница 24: ...INTRODUCTION AND OPERATION 1 10 October 1999 Part No 001 2009 201...
Страница 26: ...INTRODUCTION AND OPERATION 1 12 October 1999 Part No 001 2009 201...
Страница 40: ...INSTALLATION 2 14 October 1999 Part No 001 2009 201...
Страница 56: ...PULL DOWN MENUS 4 12 October 1999 Part No 001 2009 201...
Страница 60: ...REPEATER PROGRAMMING 5 4 October 1999 Part No 001 2009 201...
Страница 142: ...SERVICING 8 8 October 1999 Part No 001 2009 201...
Страница 191: ...SCHEMATICS AND COMPONENT LAYOUTS 10 9 October 1999 Part No 001 2009 201 Figure 10 14 RECEIVE VCO COMPONENT LAYOUT...
Страница 234: ...900 MHz CHANNEL FREQUENCY CHART A 6 October 1999 Part No 001 2009 201 This page intentionally left blank...