20
Safety and Technical Manual
Rev: 2
Form No. F_020521
VSF303 Flame Detector
This document is strictly private and confidential, reproduction without Viking Corporation approval is prohibited. © 2021 The Viking Group Inc.
6 Maintenance and Commissioning
Procedure
This maintenance schedule/ commissioning procedure is intended for guidance only. The actual
level of maintenance required will depend on the severity of the operating environment and the
likelihood of damage or the rate of contamination from oil, sea spray, deluge system etc. It is
advisable to regularly review maintenance reports and adapt the maintenance period to the
operating environment.
Содержание VSF303
Страница 1: ...VSF303 Multi Spectrum IR Flame Detector...