VIGO System PPS-02 Скачать руководство пользователя страница 1

                                       

129/133 Poznanska St., 05-850 Ozarow Mazowiecki, Poland; tel. +48 22 733 54 20; fax +48 22 733 54 26; e-mail: 

[email protected]

            1 

                                    Please note: the information contained in this document is subject to change without further notification. VIGO System reserves the right to alter the performance and any resulting specifications.VS-

11-08-10

MB

P

reamplifier

 

P

ower

 

S

upply

PPS-02

user's guide

Содержание PPS-02

Страница 1: ...54 26 e mail info vigo com pl 1 Please note the information contained in this document is subject to change without further notification VIGO System reserves the right to alter the performance and an...

Страница 2: ...ng on procedure 8 4 PPS 02 other related information 9 4 1 CE Statement of conformity 9 4 2 Electromagnetic interference 9 4 3 Operating temperature 9 4 4 Storage information 9 5 Safety instructions 1...

Страница 3: ...ts not manufactured or supplied by VIGO 4 modifications or changes of the Product as well as any adding to it without VIGO s prior authorization 5 burned active element by irradiation above damage thr...

Страница 4: ...t 2 1 PPS 02 parameters Parameter Value Unit Input voltage 0 01 V Output voltage 9 12 15 12 5 V Output current 100 mA 2 2 Coding the symbol of the power supply Sample symbol of the PPS 02 power supply...

Страница 5: ...ordic Power More details can be found HERE Power supply may be changed without notification 129 133 Poznanska St 05 850 Ozarow Mazowiecki Poland tel 48 22 733 54 20 fax 48 22 733 54 26 e mail info vig...

Страница 6: ...utput 9 VSUP Power supply output 129 133 Poznanska St 05 850 Ozarow Mazowiecki Poland tel 48 22 733 54 20 fax 48 22 733 54 26 e mail info vigo com pl 6 Please note the information contained in this do...

Страница 7: ...tor 129 133 Poznanska St 05 850 Ozarow Mazowiecki Poland tel 48 22 733 54 20 fax 48 22 733 54 26 e mail info vigo com pl 7 Please note the information contained in this document is subject to change w...

Страница 8: ...ng temperature is reached and stabilized Ready state will be indicated by the LOCK green LED light Before starting the measurements make sure the load resistance is valid IR detector module output sho...

Страница 9: ...etector parameters are guaranteed for the environment temperature not exceeding 35 O C 4 4 Storage information To ensure reliable operation and long lifetime of detector the following conditions shoul...

Страница 10: ...our device Use the cables delivered by VIGO In case of OEM systems make sure the the cables match the specifica tion of the controller Turn off the power supply before plugging unplugging cables Avoid...

Отзывы: