background image

UNPACKING

THE MACHINE

LIFTING

THE MACHINE

Move the shipping carton or crate
to the installation site.

Cut and remove the metal bands
around the shipping carton/crate.

Remove the top of the carton and
cardboard sleeve, or disassemble
the crate.

Remove the external packing
material.

External
Packing
Material

Remove the front cover by lifting it
up, off of its guides.

Attach the lifting straps to the hook
of a hoist.

Insert the metal plate

attached to the wooden stabilizer into
the slot on top of the machine.

Slowly lift the machine with a hoist,
steadying it at all times.

Move the machine to the final
operating location, and slowly lower it
into position on a workbench capable
of bearing the full weight of the
machine (155 kg).

Remove the lifting materials.

IMPORTANT:

Eyebolt (2)

BENCHMARK 250

QUICK INSTALLATION GUIDE

Shipping
Screw

End Stop
Screw

Remove the X-axis end stop screw
and shipping screw.

Remove the shipping restraint.

Re-install the X-axis end stop screw.

If the small, black X-axis
ball retainer falls out, put it back in
place before continuing.

Do not remove/discard
the end stop. It is essential to the
operation of the X-axis transport.

This describes how to unpack, install, and set up the Benchmark 250 system. It is a quick
overview. It does NOT replace the Benchmark 250 Installation Manual (P/N 799030).

Be sure to review all safety information provided in the Benchmark 250
Installation Manual before operating the system.

TOOLS

REQUIRED

/EQUIPMENT

Copyright © 2012 Quality Vision International, Inc. All rights reserved. Printed in the U.S.A. Information subject to change without notice.

P/N 799033-0812

REMOVING THE

X RESTRAINT

Shipping
Restraint

Metal
Plate

Wooden
Stabilizer

Lifting
Strap (2)

Slot

IMPORTANT:

The workbench must be stable during

system operation, with no movement or vibration.

1.

1.

1.

2.

2.

2.

3.

3.

3.

4.

4.

5.

6.

Отзывы: