The electronic combustion controller automatically
ensures optimum combustion quality. During commis-
sioning/maintenance, only the combustion values need
to be checked. To do this, test the CO content and CO
2
or O
2
content, and record these in the report on
page 97.
Note
To prevent operating faults and damage, operate the
appliance with uncontaminated combustion air.
Permissible CO content
The CO content must be < 1000 ppm for all gas types.
Permissible CO
2
or O
2
content
Operation with natural gas
Rated heating out-
put (kW)
CO
2
content (%)
O
2
content (%)
Upper heating out-
put
Lower heating out-
put
Upper heating out-
put
Lower heating out-
put
11
7.3 - 10.5
7.3 - 10.5
2.1 - 7.9
2.1 - 7.9
19
7.5 - 10.5
7.5 - 10.5
2.1 - 7.6
2.1 - 7.6
25
7.5 - 10.5
7.5 - 10.5
2.1 - 7.6
2.1 - 7.6
32
7.3 - 10.0
7.3 - 10.5
3.1 - 7.9
2.1 - 7.9
Operation with LPG
■
CO
2
content: 8.4 - 11.8 %
■
O
2
content: 3.1 - 8.1 %
If the actual CO, CO
2
or O
2
values lie outside their
respective ranges, proceed as follows:
■
Check the balanced flue system for leaks; see
page 44.
■
Check the ionisation electrode and connecting cable,
see page 48.
Note
During commissioning, the combustion controller car-
ries out an automatic calibration. Allow approx. 50 s
after the burner has started before testing the emis-
sions.
A
Fig. 39
1.
Connect a flue gas analyser at flue gas port
A
on
the boiler flue connection.
2.
Open the gas shut-off valve. Start the boiler. Cre-
ate a heat demand.
3.
Adjust the lower heating output. See the following
chapter.
4.
Check the CO
2
content. If the actual value deviates
from the permissible ranges, implement steps lis-
ted above.
5.
Enter the actual value into the report.
6.
Adjust the upper heating output. See the following
chapter.
7.
Check the CO
2
content. If the actual value deviates
from the permissible ranges by more than 1 %,
implement steps listed above.
8.
Enter the actual value into the report.
9.
Re-seal test port
A
.
Danger
Escaping flue gas can damage your health.
Check test port
A
for leaks.
Commissioning, inspection, maintenance
Checking the combustion quality
6167586
Содержание Vitodens 100-W B1HF Series
Страница 14: ...14 1 4 5 3 2 Fig 4 Installation sequence Removing the boiler from the packaging 6167586 Installation ...
Страница 30: ...30 1 2 Fig 22 Installation sequence Fitting the front panel 6167586 Installation ...
Страница 87: ...87 1 2 4 3 7 5 6 Fig 48 Troubleshooting Repairs cont 6167586 Diagnosis ...
Страница 107: ...107 6167586 ...