8
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the heating system and checking the supply of ventilation air
.........................
9
•
2. Checking the power supply
•
3. Changing the language (if required)
.................................................................................
9
•
•
4. Setting the time and date (if required)
.............................................................................. 10
•
5. Naming heating circuits
..................................................................................................... 10
•
•
6. Checking the gas type
....................................................................................................... 10
•
•
•
7. Removing the front panel
.................................................................................................. 11
•
•
•
8. Function sequence and possible faults
........................................................................... 11
•
•
•
9. Testing the static and supply pressure
............................................................................ 12
•
10. Setting the maximum heating output
............................................................................... 13
•
•
11. Checking the combustion chamber pressure limiter
..................................................... 14
•
•
12. Removing the burner and checking the burner gasket
.................................................. 15
•
•
13. Checking the burner gauze assembly and thermal insulation block
............................ 18
•
•
14. Checking and adjusting the ignition and ionisation electrodes
.................................... 21
•
•
15. Cleaning the combustion chamber and heating surfaces
............................................. 21
•
•
16. Cleaning the condensate drain system
............................................................................ 22
•
•
17. Cleaning the neutralising system (if installed)
................................................................ 23
•
•
18. Checking the condensate drain and neutralising system (if installed) for
obstructions and leaks
...................................................................................................... 24
•
•
19. Checking the gaskets and thermal insulation sections on the boiler side
................... 25
•
•
20. Checking the expansion vessel and system pressure
................................................... 25
•
•
21. Checking the water quality
................................................................................................ 25
•
•
22. Checking the mixer for ease of operation and leaks
...................................................... 26
•
•
•
23. Checking all connections on the heating water and DHW sides for leaks
•
•
•
24. Checking the safety valve function
•
•
25. Installing the burner
........................................................................................................... 26
•
•
•
26. Checking the firm seating of electrical connections
•
•
•
27. Checking all gas equipment for tightness at operating pressure
................................. 26
•
•
•
28. Checking the combustion quality
..................................................................................... 26
•
•
29. Checking the ventilation air apertures in the installation room (only for open flue
operation)
•
•
•
30. Checking the external LPG safety valve (if installed)
•
31. Matching the control unit to the heating system
............................................................ 28
•
32. Adjusting heating curves
.................................................................................................. 28
•
33. Connecting the control unit to the LON
........................................................................... 29
•
34. Calling up and resetting the "Service" display
............................................................... 31
•
•
•
35. Mounting the front panel
................................................................................................... 31
•
36. Instructing the system user
.............................................................................................. 32
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance
5792 925 GB
Содержание Vitocrossal 100 CI1
Страница 119: ...119 Up to 80 kW Fig 67 Connection and wiring diagram Connection and wiring diagram cont 5792 925 GB Appendix ...
Страница 138: ...138 5792 925 GB ...
Страница 139: ...139 5792 925 GB ...