Set-up
6
Tank Set-up
For 92 USG / 350 ltr tank capacity only:
If a boiler is to be installed on top of the tank, arrange boiler to lock into the front
positioning pins of the tank.
H
For narrow passageways, remove
lower portion of crating and carry
DHW tank to its installation location
by means of crating boards mounted
on the tank lengthwise.
See Installation Instructions of
the “Transport Handles”
(accessory) to move the tank
into the mechanical room.
H
Packaged M 8 bolts are necessary for
the set-up of a multiple tank
installation.
H
Leave adequate clearance to the wall
or other objects enabling easy access
to the aquastat (where applicable).
H
Locate tank(s) on flooring or
foundation capable of supporting the
weight of the tank(s) filled with
water.
H
The tank does not require a special
foundation and can be placed directly
on the floor. If, for cleanliness
purposes, the tank is to be kept off
the floor, a foundation can be used for
each tank or tank battery.
H
A minimum clearance of 17¾” / 450
mm must be maintained at the back
of the tank for the installation of the
sensor well and DHW tank
temperature sensor.
H
Level tank using leveling bolts on tank
frame.
Recommended installation clearances for service access
Storage capacity
USG
Ltr
42
160
53
200
92
350
120
450
Rear
inches
mm
18
460
18
460
18
460
18
460
Sides
May be reduced if rear pipe
connections can be reached with
less clearance
inches
mm
12
300
12
300
12
300
12
300
Top
inches
mm
12
300
12
300
12
300
12
300
Front
inches
mm
24
600
24
600
24
600
24
600
Minimum clearances to combustibles
Storage capacity
USG
Ltr
42
160
53
200
92
350
120
450
All sides
inches
mm
0
0
0
0
0
0
0
0
5167
535
v1
.2
min: ¾”
20 mm
max: 1½”
35 mm
Fig 1.
Leveling bolt