Set-up
10
Transport and Handling
(Continued)
only for 120 USG / 450 ltr capacity
8.
Mount insulation.
9.
Fully insert sensor into opening in
tank cap and secure using
spring-clip.
10.
Install insulation.
11.
Install front panel.
5167
535
v1
.2
9.
11.
10.
8.
Fig 5.
Installing panels and insulation