15
Required cables and hydraulic lines
G
K
P
C
F
L
O
Q
H
S
D
E
M
N
R
A
B
A
Heat pump
B
Electric terminal area in the heat
pump
C
Power cable, compressor/fan (3/N/
PE 400 V/50 Hz, on site)
D
2 connecting cables inside DN 100
KG conduit (on site), fully wired (5,
15 or 30 m):
■
Control cable
230 V~
■
LV cable
< 42 V
Note
The maximum cable length is
30 m. Extensions are not permis-
sible.
Preparing for installation
Siting requirements
(cont.)
5516 436 GB
Installation
Содержание VITOCAL 300-A
Страница 5: ...5 Certificates Declaration of conformity 116 Keyword index 117 Index Index cont 5516 436 GB ...
Страница 79: ...79 8x Troubleshooting Repairs cont 5516 436 GB Service ...
Страница 94: ...94 0011 0010 0009 0008 0004 0005 0006 0007 0001 0003 0002 Parts lists Additional components cont 5516 436 GB ...
Страница 96: ...96 0007 0007 0007 0004 0005 0004 0003 0003 0003 0003 0006 0002 0001 Parts lists Air module cont 5516 436 GB ...
Страница 122: ...122 5516 436 GB ...
Страница 123: ...123 5516 436 GB ...