■ Run power cable
M
to the heat pump
outside the building in a KG conduit
DN 100.
■ Cable length required in the heat pump
from top edge of foundation: Min.
0.7 m
■ Observe the regulations imposed by
your local power supply utility.
Connecting cables
N
Route prepared connecting cables (con-
trol cable 230 V~, LV lead < 42 V)
N
outside the building in a KG conduit
DN 100. Protect the plugs at the ends of
the cables from dirt and damage (e.g.
with bubble wrap).
Cable length required in the heat pump
from top edge of foundation
■ Control cable 230 V~: Min. 0.9 m
■ LV cable < 42 V: Min. 0.7 m
Routing KG conduits
C
,
D
■ Provide a wire pull for the cables (
M
,
N
).
■ To facilitate the routing of cables D
through the KG conduit, avoid 90°
bends; instead use 3 x 30° or 2 x 45°.
■ Route the KG conduit with a slope
towards the heat pump and fit a con-
densate drain if required.
■ Ensure that wall ducts
R
are mois-
ture-proof and waterproof.
■ Seal the apertures of the KG conduit
so that no animals or moisture can
enter the building.
Preparing for installation
Siting requirements
(cont.)
5516 436 GB
Содержание VITOCAL 300-A
Страница 5: ...5 Certificates Declaration of conformity 116 Keyword index 117 Index Index cont 5516 436 GB ...
Страница 79: ...79 8x Troubleshooting Repairs cont 5516 436 GB Service ...
Страница 94: ...94 0011 0010 0009 0008 0004 0005 0006 0007 0001 0003 0002 Parts lists Additional components cont 5516 436 GB ...
Страница 96: ...96 0007 0007 0007 0004 0005 0004 0003 0003 0003 0003 0006 0002 0001 Parts lists Air module cont 5516 436 GB ...
Страница 122: ...122 5516 436 GB ...
Страница 123: ...123 5516 436 GB ...