27
Aligning the heat generator at the installation site
4x
Fig. 15
Fitting accessories
Check before final siting: Have all the accessories
which are to be mounted from the back of the boiler
been fitted (e.g. connection set)?
Balanced flue connection
Connecting the downstream balanced flue pipe
Route all horizontal sections of the flue pipe with a
constant fall of 3°.
Flue system installation instructions
Note
Only use the "System certificate" and "Skoberne
GmbH flue system" labels in conjunction with the
Viessmann flue system made by Skoberne.
Do not carry out
commissioning
until the following
conditions are met:
■
Free passage through the flue gas pipes.
■
Flue system with positive pressure is gas-tight.
■
Inspection port covers checked for secure and tight
seating.
■
Apertures for ensuring sufficient combustion air sup-
ply are open and cannot be closed off.
■
Applicable regulations on installing and commission-
ing flue systems have been followed.
Danger
Leaking or blocked flue systems or an insuffi-
cient supply of combustion air cause life threat-
ening poisoning due to carbon monoxide in the
flue gas.
Ensure the flue system functions correctly. Aper-
tures for combustion air supply must not be able
to be closed off.
Prevent condensate drainage via a wind protec-
tor.
Installation sequence
Installing and aligning the Vitovalor PA2
(cont.)
5839343
Installation
Содержание E00T
Страница 8: ...8 14 Keyword index 95 Index Index cont 5839343 ...
Страница 97: ...97 5839343 ...
Страница 98: ...98 5839343 ...
Страница 99: ...99 5839343 ...