35
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Removing the front panels
................................................................................................ 37
•
2. Checking the power supply
•
•
3. Filling and venting the primary circuit
............................................................................. 37
•
4. Filling the trap with water
.................................................................................................. 39
•
5. Switching on the power supply and the ON/OFF switch
•
6. Commissioning assistant
.................................................................................................. 40
•
7. Changing the language
...................................................................................................... 40
•
8. Setting the time and date
................................................................................................... 41
•
•
9. Filling and venting the process circuit
............................................................................. 41
•
•
10. Filling the secondary circuit
.............................................................................................. 43
•
•
11. Venting the secondary circuit
........................................................................................... 44
•
12. Setting the maximum heating output
............................................................................... 45
•
•
•
13. Checking all connections on the heating and cylinder sides for leaks
•
14. Naming the heating circuits
.............................................................................................. 46
•
15. Checking the gas type
....................................................................................................... 46
•
16. Converting the gas type (only for operation with LPG)
.................................................. 46
•
17. Information on automatic testing of the flue gas temperature sensor
......................... 46
•
•
•
18. Testing the static and supply pressure
............................................................................ 47
•
•
•
19. Function sequence and possible faults
........................................................................... 48
•
20. Checking the balanced flue system for tightness (annular gap check)
........................ 50
•
•
21. Replacing the desiccant bag
............................................................................................. 51
•
•
22. Removing the burner
......................................................................................................... 51
•
•
23. Checking the burner gasket and burner gauze assembly
.............................................. 52
•
•
24. Checking and adjusting the ignition and ionisation electrodes
.................................... 53
•
•
25. Cleaning the heat exchanger heating surfaces
............................................................... 53
•
•
26. Checking the condensate drain and cleaning the trap
................................................... 55
•
•
27. Installing the burner
........................................................................................................... 56
•
•
28. Checking the neutralising system (if installed)
•
•
•
29. Checking the expansion vessel and process circuit pressure
...................................... 57
•
•
•
30. Checking the firm seating of electrical connections
•
•
•
31. Checking all gas equipment for tightness at operating pressure
................................. 57
•
•
•
32. Checking the combustion quality
..................................................................................... 57
•
•
•
33. Checking the flue system for unrestricted flow and tightness
•
•
34. Checking the flue gas routing
•
•
•
35. Checking the external LPG safety valve (if installed)
•
36. Matching the control unit to the heating system
............................................................ 59
•
37. Adjusting heating curves
.................................................................................................. 59
•
38. Connecting the control unit to LON
................................................................................. 60
•
39. Scanning and resetting the "Service" display
................................................................. 61
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5678 044 GB
Содержание D2RA
Страница 34: ...34 1 3 4 2 2x 5 5 Fig 24 Installation sequence Fitting the front panels 5678 044 GB Installation ...
Страница 113: ...113 Maintenance Checking the Vitotronic 200 H accessories cont 5678 044 GB Maintenance ...
Страница 126: ...126 0004 0002 0004 0002 0001 0001 0002 0004 0002 0003 Fig 79 Parts lists Sorption module 5678 044 GB Components ...
Страница 133: ...133 Parts lists Sorption module hydraulics cont 5678 044 GB Components ...
Страница 136: ...136 0001 0002 0003 0004 0005 Fig 83 Parts lists Miscellaneous 5678 044 GB Components ...
Страница 163: ...163 5678 044 GB ...