Please note
Mechanically strained hydraulic connections
lead to leaks and appliance damage.
Connect on-site lines so that they are free of
load and torque stress.
Connecting supplied pipe sections to the sorption module
2.
A
B
2x
2x
3.
2x
1.
Fig. 7
A
Primary side connections to the left (viewed from
front)
B
Primary side connections to the right (viewed from
front)
Natural heat source
Geothermal energy
Solar thermal
■
Ensure adequate thermal and anti-vibration insulation
of all pipes routed through walls.
■
Insulate all pipes inside the building to prevent heat
and vapour diffusion.
■
We recommend that you use the brine connection set
(accessories).
■
Ensure adequate thermal and anti-vibration insulation
of all pipes routed through walls.
■
Thermally insulate all pipes inside the building.
■
Fit a thermostatic mixing valve:
Mixing valve installation instructions
Installation sequence
Connections on the primary side
5678 044 GB
Installation
Содержание D2RA
Страница 34: ...34 1 3 4 2 2x 5 5 Fig 24 Installation sequence Fitting the front panels 5678 044 GB Installation ...
Страница 113: ...113 Maintenance Checking the Vitotronic 200 H accessories cont 5678 044 GB Maintenance ...
Страница 126: ...126 0004 0002 0004 0002 0001 0001 0002 0004 0002 0003 Fig 79 Parts lists Sorption module 5678 044 GB Components ...
Страница 133: ...133 Parts lists Sorption module hydraulics cont 5678 044 GB Components ...
Страница 136: ...136 0001 0002 0003 0004 0005 Fig 83 Parts lists Miscellaneous 5678 044 GB Components ...
Страница 163: ...163 5678 044 GB ...