39
5.
1.
4.
2.
2x
3.
Fig. 47
1.
Hook the bottom front panel into the base rail.
Secure the front panel with 2 screws M 6 x 10.
2.
Insert the location stud into the front panel and
secure.
3.
Position the front panel in the lower rim and flip it
shut tightly.
4.
Secure the front panel with 2 screws (M 5 x 25).
5.
Push the front panel closed.
Commissioning and adjustment
"Vitocrossal 100, type CI1" service instructions
and boiler control unit operating instructions
Fitting the front panel
5792 916 GB
Содержание CI1
Страница 43: ...43 5792 916 GB ...