Starting the fuel cell module (Commissioning/maintenance operating mode)
GEN
MNT
ERR
GRD
DCT
SET
ITEM
STATE
B
C
A
Fig. 67
1.
Remove cover
A
.
2.
Turn ON/OFF switch
B
on the fuel cell module to
"I"
.
After a 20 second start-up routine, programming
unit
C
displays:
01
oFF
ITEM
STATE
3.
Press
SET
.
"oFF"
flashes.
4.
Within the next 30 s select
"on"
using / .
5.
Press
SET
to confirm.
The
MNT
indicator lights up. The fuel cell module
is in
"Commissioning/maintenance"
operating
mode.
Changing the gas type on the fuel cell module
Delivered condition: Gas type "E"
Conversion is required only for gas type "LL".
"Commissioning/maintenance"
operating mode
must be enabled (
MNT
illuminates).
1.
Select
"94"
using / .
2.
Press
SET
to confirm.
3.
Select gas type
"E"
or
"LL"
using / .
4.
Press
SET
to confirm.
5.
Hold down
SET
until
"END"
and
"nd"
are dis-
played.
6.
Turn ON/OFF switch
B
on the fuel cell module to
"0"
and then back to
"I"
.
7.
Select
"94"
using / and check the setting made.
Commissioning, inspection, maintenance
Preparing the fuel cell module for commissioning
(cont.)
5775 636 GB
Содержание C3TB
Страница 44: ...44 3 5 1 2x 2 4 7 6 Fig 43 Installation sequence Fitting the front panels 5775 636 GB Installation ...
Страница 48: ...48 14 Fig 47 Installation sequence If required for easier handling Dismantling cont 5775 636 GB Installation ...
Страница 136: ...136 Troubleshooting Repairs gas condensing module cont 5775 636 GB Diagnosis ...
Страница 143: ...143 Parts lists Heat cell assembly 5775 636 GB Components ...
Страница 148: ...148 0001 0001 0003 0003 0002 0002 0004 Fig 118 Parts lists External connection assembly 5775 636 GB Components ...
Страница 154: ...154 0006 0003 0005 0001 0002 0004 Fig 121 Parts lists Miscellaneous assembly 5775 636 GB Components ...
Страница 160: ...160 Parts not shown 0009 PCB IU100 B30 Parts lists Fuel cell assembly 5775 636 GB Components ...
Страница 161: ...161 Parts lists Fuel cell assembly cont 5775 636 GB Components ...
Страница 187: ...187 5775 636 GB ...