55
Note
The system must be protected
against frost down to –15 °C.
Viessmann heat transfer medium is a
ready-mixed ethylene glycol-based
medium, for down to –15 °C, contain-
ing inhibitors for corrosion protec-
tion.
3.
Check the connections for possible
leaks. Replace faulty or displaced
gaskets.
Information on setting the primary
pump
Temperature differential between the
primary flow and primary return:
3 K to 5 K.
For this, it may be appropriate to set the
primary pump to a lower stage.
Filling and venting on the secondary side
Unsuitable fill and top-up water increa-
ses the level of deposits and corrosion
and may lead to system damage.
Regarding the quality and amount of
heating water, incl. fill and top-up water,
observe the VDI 2035 [or local regula-
tions].
■ Thoroughly flush the entire heating
system prior to filling it with water.
■ Only use fill water of potable quality.
■ Soften fill water with a hardness above
16.8 °dH (3.0 mol/m
3
), e.g. with the
small softening system for heating
water (see the Viessmann Vitoset
pricelist).
!
Please note
To prevent equipment damage,
protect electrical components on
the shield from escaping liquids.
1.
Open any on-site non-return valves if
installed.
2.
Check the pre-charge pressure of the
expansion vessel (see page 57).
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5601 598 GB
Service
Содержание BWT 241.A Series
Страница 18: ...18 Removing the cylinder module 3 1 5 4 2 2x Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 19: ...19 6 X3 sG sH lJ aYH 7 F6 F18 8 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 20: ...20 aCH 11 10 193C SLP N 224 6 9 Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 21: ...21 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 22: ...22 4x 4x 6x 2x 22 19 21 20 Installation sequence Siting the heat pump cont 5601 598 GB...
Страница 23: ...23 4x 23 2x 26 25 24 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 27: ...27 C D BB Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Страница 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 598 GB Service...
Страница 72: ...72 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 598 GB...
Страница 81: ...81 0001 0005 0006 0003 0008 0009 0010 0007 0004 0002 Parts lists type BWT 400 V Casing cont 5601 598 GB Service...
Страница 105: ...105 0006 0005 0004 0001 0003 0002 0002 0003 Parts lists type BWT M 230 V Fitting set cont 5601 598 GB Service...
Страница 123: ...123 5601 598 GB...