■ Route LV cables < 42 V separately
from cables > 42 V/230 V~/400 V~.
■ Strip the insulation from the cables as
close to the terminals as possible, and
bundle tightly to the corresponding ter-
minals.
■ Secure cables with cable ties.
■ If 2 components are connected to the
same terminal, press both cores
together in a
single
wire ferrule.
This ensures that, in the event of a fault
(e.g. when detaching a wire), the wires
cannot drift into the adjacent voltage
area.
When routing the on-site power cables,
observe the location of the cable entries
into the appliance through its back panel
(see page 20).
< 42 V
230 V
1.
Route LV leads through the "< 42 V"
aperture to the heat pump control unit
wiring chamber and apply strain relief
using the cable ties provided.
2.
Route 230 V~ cables and power
cables for the compressor through
the "230 V~" aperture to the heat
pump control unit wiring chamber and
apply strain relief using the cable ties
provided.
For power supply, see from
page 57.
Installation sequence
Electrical connection
(cont.)
5546 273 GB
Installation
Содержание BW 351.A07
Страница 28: ...28 Removing the top panel 1 Installation sequence Siting the heat pump cont 5546 273 GB ...
Страница 88: ...88 Opening the casing door Troubleshooting Repairs cont 5546 273 GB ...
Страница 90: ...90 D C Q R S V K X P F J U T X Q S T R D Y W Type BWC 351 A07 Troubleshooting Repairs cont 5546 273 GB ...