LEDs explained
A
Voltage "U":
Illuminates green if voltage is
applied.
B
Relay "R":
Illuminates yellow if the phase
sequence is correct.
Does not illuminate if the phase
sequence is incorrect.
Connecting to terminals X3.8/X3.9
After
connecting the power supply, one
of the following components
must
be
connected at terminals X3.8 and X3.9:
■ Primary circuit pressure switch and/or
frost stat
or
■ Jumper from the pack
Installation sequence
Power supply
(cont.)
5600 161 GB
Содержание BW 01.A06
Страница 65: ...65 Removing the top panel 1 Installation sequence Siting the heat pump cont 5600 161 GB Installation ...
Страница 121: ...121 Opening the shield Troubleshooting Repairs cont 5600 161 GB Service ...
Страница 122: ...122 Overview of internal components M C D F E B G O N K P A J I L Troubleshooting Repairs cont 5600 161 GB ...
Страница 166: ...166 5600 161 GB ...
Страница 167: ...167 5600 161 GB ...