72
3.
Fill (flush) and vent the secondary cir-
cuit:
■ Slightly open the quick-action air
vent valve (see safety assembly,
chapter "Connecting the secon-
dary circuit"); it remains open.
■ For venting, use lever to move the
3-way diverter valve for "Heating/
DHW heating" to its centre position
and click into place: See diagram.
4.
!
Please note
To prevent equipment dam-
age, check the flow and return
connections of the secondary
circuit at the heat pump for
tightness
.
In the case of leaks, switch off
the appliance immediately,
drain the water and check the
seating of the seal rings.
Always replace displaced seal
washers.
5.
Check system pressure. Top up with
water if required.
Minimum system pressure:
0.8 bar (80 kPa)
Permiss. operating pressure:
3 bar (0.3 MPa)
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5546 699 GB
Содержание AWT-AC 241.A04
Страница 19: ...19 SLP N 9 11 aCH sG lJ 10 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 20: ...20 X20 2x 16 17 2x 12 14 18 13 15 Installation sequence Installing the internal unit cont 5546 699 GB...
Страница 21: ...21 2x 4x 4x 6x 21 19 20 22 Installation sequence Installing the internal unit cont 5546 699 GB Installation...
Страница 89: ...89 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5546 699 GB Service...
Страница 104: ...104 0010 0009 0007 0002 0004 0008 0001 0005 0003 0006 Parts lists internal unit Casing internal unit cont 5546 699 GB...
Страница 165: ...165 5546 699 GB...
Страница 166: ...166 5546 699 GB...
Страница 167: ...167 5546 699 GB...