33
C
D
C
D
4.
2.
3.
2x
Example type AWS/AWS-AC 104
C
Liquid gas line
D
Hot gas line
2.
!
Please note
Contamination (such as metal
swarf) or moisture must not
enter the copper pipes.
Therefore, hold the pipe open-
ings down or plug them.
Remove the nuts from the refrigerant
line fittings (hot gas and liquid gas
line).
Slide the nuts onto the refrigerant
lines prepared on site.
3.
Swage the pipe ends.
4.
Secure the pipes.
Tighten the nuts with the following torque:
Type
AWS/
AWS-AC
Line
Connection to
external unit
Torque in Nm
104
Liquid gas line
7
6 mm
⁷
⁄
₁₆
UNF
14–18
Hot gas line
7
12 mm
¾ UNF
50–62
Installation sequence
Connecting the refrigerant lines
(cont.)
5724 152 GB
Installation
Содержание AWS 104
Страница 5: ...5 Certificates Declaration of conformity 119 Keyword index 120 Index Index cont 5724 152 GB...
Страница 86: ...86 Placing the control panel in its service position 4x 1 2 3 Troubleshooting Repairs 5724 152 GB...
Страница 87: ...87 Opening programming unit 3 2 1 2x Troubleshooting Repairs cont 5724 152 GB Service...
Страница 88: ...88 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5724 152 GB...
Страница 89: ...89 Removing separating plate 1 2 Troubleshooting Repairs cont 5724 152 GB Service...
Страница 98: ...98 101 300 104 231 100 232 230 105 103 103 300 A Parts lists Parts list internal unit cont 5724 152 GB...
Страница 106: ...106 622 614 643 670 642 615 616 637 640 639 669 Parts lists Parts list external unit type AWS AWS AC cont 5724 152 GB...