7
Please dispose of packaging waste in line with statu-
tory regulations.
DE:
Use the disposal system organised by
Viessmann.
AT:
Use the ARA statutory disposal system (Altstoff
Recycling Austria AG, licence number 5766).
CH:
Packaging waste is disposed of by the HVAC
contractor.
Symbols
Symbol
Meaning
Reference to other document containing
further information
1.
Step in a diagram:
The numbers correspond to the order in
which the steps are carried out.
Warning of material losses and environ-
mental pollution
Live electrical area
Pay particular attention.
■
Component must audibly click into place.
or
■
Acoustic signal
■
Fit new component.
or
■
In conjunction with a tool: Clean the sur-
face.
Dispose of component correctly.
Dispose of component at a suitable collec-
tion point. Do
not
dispose of component in
domestic waste.
The steps in connection with commissioning, inspec-
tion and maintenance are found in the "Commission-
ing, inspection and maintenance" section and identified
as follows:
Symbol
Meaning
Steps required during commissioning
Not required during commissioning
Steps required during inspection
Not required during inspection
Steps required during maintenance
Not required during maintenance
Intended use
The appliance is intended solely for installation and
operation in sealed unvented heating systems that
comply with EN 12828, with due attention paid to the
associated installation, service and operating instruc-
tions. It is only designed for heating up heating water
that is of potable water quality.
Intended use presupposes that a fixed installation in
conjunction with permissible, system-specific compo-
nents has been carried out.
Information
Disposal of packaging
5773 238 GB
Information
Содержание 7513244
Страница 11: ...11 8 9 4x 8x 12 10 11 Fig 2 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 12: ...12 13 14 15 Fig 3 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 13: ...13 16 Fig 4 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 14: ...14 sF 17 19 21 20 18 Fig 5 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 15: ...15 24 22 23 Fig 6 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 16: ...16 27 26 25 Fig 7 Preparing for installation Installation preparations cont 5773 238 GB Installation ...
Страница 35: ...35 2x 1 4 2 3 5 Fig 27 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Страница 135: ...135 Parts lists Hydraulic assembly 5773 238 GB Components ...
Страница 146: ...146 0004 0002 0005 0006 0001 0003 Fig 107 Parts lists Miscellaneous 5773 238 GB Components ...