37
■ Route LV leads < 42 V and
cables > 42 V/230 V~/400 V~
separately.
■ Strip the insulation from the
cables as close to the terminals
as possible, and bundle tightly
to the corresponding terminals.
■ Secure cables with cable ties.
This ensures that, should there
be an error, for example when
detaching a wire, the wires can-
not drift into the adjacent voltage
area.
!
Please note
The BUS connecting lead for the
internal/external unit (12 V or
43 V) is, in accordance with
safety requirements,
not
a low
voltage cable.
The BUS connecting lead
must
be routed together with the
230 V cables.
Note
To ensure that the control panel can be
placed in the service position (see
page 85), all connections on the con-
trol panel (see page 39) must be made
with flexible cables.
Installation sequence
Electrical connections
(cont.)
5601 429 GB
Installation
Содержание 7424689
Страница 83: ...83 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5601 429 GB Service ...
Страница 84: ...84 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 429 GB ...
Страница 85: ...85 Placing the control panel in its service position 4x 2 3 1 Troubleshooting Repairs cont 5601 429 GB Service ...
Страница 86: ...86 Removing the separating plate 1 2 Troubleshooting Repairs cont 5601 429 GB ...