33
Tighten the nuts with the following torques:
Type
AWB/
AWB-AC
Line
Connection to
external unit
Torque in Nm
201.A04
Liquid line
7
6 mm
⁷
⁄
₁₆
UNF
14–18
Hot gas line
7
12 mm
¾ UNF
50–62
201.A07
Liquid line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
201.A10
Liquid line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
201.A13
Liquid line
7
10 mm
⅝
UNF
33–42
Hot gas line
7
16 mm
⅞
UNF
63–77
Connection to the internal unit
2.
1.
3.
2x
D
C
D
C
D
C
C
Liquid line
D
Hot gas line
Installation sequence
Connecting the refrigerant lines
(cont.)
5601 429 GB
Installation
Содержание 7424689
Страница 83: ...83 Opening the programming unit 1 3 2 2x Troubleshooting Repairs 5601 429 GB Service ...
Страница 84: ...84 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 429 GB ...
Страница 85: ...85 Placing the control panel in its service position 4x 2 3 1 Troubleshooting Repairs cont 5601 429 GB Service ...
Страница 86: ...86 Removing the separating plate 1 2 Troubleshooting Repairs cont 5601 429 GB ...