background image

Instructions for Use

Prevista Dry WC element building

project version

for WC flush plates for Prevista

Model

Year built (from)

8524.19

07/2019

INT

Содержание Prevista 8524.19

Страница 1: ...Instructions for Use Prevista Dry WC element building project version for WC flush plates for Prevista Model Year built from 8524 19 07 2019 INT...

Страница 2: ...verview 6 2 3 2 Compatible components 6 2 3 3 Technical data 7 3 Handling 8 3 1 Assembly information 8 3 1 1 Mounting conditions 8 3 1 2 Installation dimensions 9 3 2 Assembly 9 3 2 1 Mounting WC elem...

Страница 3: ...extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of not...

Страница 4: ...any e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant nation...

Страница 5: ...cope Notice Regulations applicable in Ger many Suitable masonry walls EN 1996 1 1 Suitable concreted walls DIN 1045 2 2 Intended use 2 2 1 Areas of use The Prevista Dry WC element is suitable for moun...

Страница 6: ...ixing in support profile 8 Mounting set for WC ceramic 9 flushing pipe 10 WC connection socket with lip seal 11 Fixing set model 8180 73 12 Protective plug for drain elbow DN90 13 Protective plug for...

Страница 7: ...pective instruc tions for use 2 3 3 Technical data Small flush volume Factory setting approx 3 l setting range approx 2 4 l Large flush volume Factory setting approx 6 l setting range approx 3 5 7 5 l...

Страница 8: ...ht the marked height of the upper edge of the finished floor must be observed The WC element can be extended by a remote flush actuation or by an electronic actuation as well as by sensitive flush pla...

Страница 9: ...Masonry and concreted walls When mounting multiple WC elements with an interval of 500 mm Viega recommends the use of a Prevista Dry support bracket model 8570 48 Observe the instructions for use of...

Страница 10: ...390 mm Drill the holes Insert the dowels Mount the fixing set Determine and mark the fixing points on the floor n X3 375 mm Drill the holes Insert the dowels Mounting to a masonry wall 9 9 9 Handling...

Страница 11: ...the element in accordance with the on site marking of the upper edge of the finished floor n X 1000 mm Tighten the feet of the element using a fork spanner Screw the element to the wall The element i...

Страница 12: ...Connecting concealed cistern Turn the cover plate lock 90 in anti clockwise direction Remove the cover plate Remove the plug Insert an empty pipe Handling Prevista Dry WC element building project vers...

Страница 13: ...Fasten the empty pipe in the cistern Mount the screw fittings Mount the corner valve Fasten the corner valve Handling Prevista Dry WC element building project version 13...

Страница 14: ...orner valve Insert the cover plate into the cistern Turn the cover plate lock by 90 in a clockwise direction Place the revision shaft on the cover plate Handling Prevista Dry WC element building proje...

Страница 15: ...To remove the revision shaft press in the fixing clips at the side Handling Prevista Dry WC element building project version 15...

Страница 16: ...in elbow Insert the mounting bracket for the drain elbow Insert the drain elbow to the desired depth Fasten the drain elbow using the bow Fit the site protection Handling Prevista Dry WC element build...

Страница 17: ...of the element with a nut Place the protective caps on the threaded rods Corn a suitable gypsum cladding panel at the revision shaft and at the site protection by applying gentle pressure Cut out the...

Страница 18: ...ith suitable gypsum cardboard cladding panels 3 2 5 Setting the flush volume For an electronic flush actuation the small flush volume must be set to 2 litres Handling Prevista Dry WC element building...

Страница 19: ...accessible n The water supply has been shut off n The ceramic has been mounted Fold the tabs forward Lift the drain valve Remove the drain valve through the revision opening Handling Prevista Dry WC...

Страница 20: ...volume at the drain valve Requirements n The drain valve has been dismounted n The flushing throttle has been removed Unlock the flushing throttle Set the flush flow at the throttle Setting the flush...

Страница 21: ...high concentration of calcium or magnesium salts there is the risk of limescale deposits developing on the inlet and drain valves The valves may have to be replaced depending on the extent of the depo...

Страница 22: ...Viega Technology GmbH Co KG service technik viega de viega com INT 2020 02 VPN190317...

Отзывы: