NOTICE!
The creation of a floor recess must be agreed with the fol-
lowing people:
– a structural engineer
– the on-site fire protection inspector or the specialist
engineer for fire protection
If necessary, proof of compliance with building code or an
expert's report must exist.
2.3.2
Sealing
The drain can be sealed both conventionally as well as with bonded
sealing.
Depending on the type of sealing, you will require the relevant equip-
ment set
Chapter 2.4 ‘Required accessories’ on page 14.
Product information
Advantix bathroom drain
9 from 25