for bonded sealing (tiled shower) with sealing mat
Model
Year built:
4980.60
from 01/2012
en_INT
Advantix Advantix bath drain 62 mm, (recon-struction model)
Instructions for Use
Страница 1: ...for bonded sealing tiled shower with sealing mat Model Year built 4980 60 from 01 2012 en_INT Advantix Advantix bath drain 62 mm recon struction model Instructions for Use...
Страница 2: ...Advantix Advantix bath drain 62 mm reconstruction model 2 from 21...
Страница 3: ...formation for use 9 2 4 1 Installation variations 9 2 4 2 Sealing 10 2 4 3 Fire protection 12 2 5 Required accessories 12 3 Handling 14 3 1 Assembly information 14 3 1 1 Important note 14 3 1 2 Instal...
Страница 4: ...nd to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes W...
Страница 5: ...DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws...
Страница 6: ...h proof of practicability in keeping with building law for stress classes A and AO ETAG 022 T1 Approved bonded sealings with proof of practicability in keeping with building law for stress classes A B...
Страница 7: ...c tion Fields of application on page 6 Check if the drainage capacity is sufficient before mounting 2 2 2 Media The drain is intended for draining of household type wastewater in con stant operation s...
Страница 8: ...DN drain socket 40 50 Drainage capacity Chapter 2 2 3 Drainage capacity on page 7 Dimensions and installa tion height Chapter 3 1 2 Installation dimen sions on page 15 Water head seal 25 mm Load class...
Страница 9: ...floor at the same time NOTICE The creation of a floor recess must be agreed with the fol lowing people a structural engineer the on site fire protection inspector or the specialist engineer for fire...
Страница 10: ...ss and the underground as well as the selection of the suitable bonded sealing must be carried out in compliance with the valid standards and regulations see Regula tions from section Sealing on page...
Страница 11: ...d n The screed must be laid at a minimum incline of 1 2 n The installation must be carried out properly in acc with the mounting instructions and the manufacturer s information 1 9 8 7 6 2 3 4 5 Fig 4...
Страница 12: ...an be achieved Fig 5 Example fire protection pipe lead in Mounting instruction of the R120 pipe lead in see model 4923 5 Art No 491 673 2 5 Required accessories Advantix tops are available in a number...
Страница 13: ...barrier which also closes the drain odour tight if the water seal in the odour trap has evaporated Odour nuisance is even avoided with drains that are only seldom used Odour barriers can be found in...
Страница 14: ...corresponds with the planned floor construction n Ensure that the required connection line is installed with the neces sary incline to the planned installation location n If necessary supply the requi...
Страница 15: ...ing the drain The connection to the wastewater system must be completed before the drain can be installed in the floor construction Proceed as follows Requirements n A pipe to the planned drainage pos...
Страница 16: ...ap Align the connection elbow on the joint Push the drain socket into the drainpipe completely 3 2 2 Prepare for subsequent work A few points must be observed to integrate the drain into the floor con...
Страница 17: ...can be integrated into concrete screed or a heat insulation layer for example It is important that the upper edge of the drain flange is flush with the upper edge of the sealing layer If necessary rai...
Страница 18: ...ue to improper installation If hollow spaces occur during the lining of the drain leaks may occur when pressure is applied Check the proper completion of the subsequent work Screed and floor tiles mus...
Страница 19: ...for use Lay the sealing collar into the bonded sealing Apply a second layer of bonded sealing onto the sealing collar and if necessary onto the floor 3 2 4 Mounting the top The top with the grate mus...
Страница 20: ...floor covering 3 3 Care 3 3 1 Care tips Normal soap or a mild cleaning agent can be used for regular care and prevention of lime scale on the grate and frame Under no circum stances should scouring ag...