Requirements:
n
The press machine is ready for operation, the green LED is illumi‐
nated.
n
A press jaw has been correctly inserted.
▶
Check whether the nominal width of the press connector matches
the nominal width of the press jaw.
▶
Fit the press machine with the press jaw inserted accurately and at
a right angle to the pipe axis on the press connector.
▶
Keep the Start button pressed until the automatic process starts.
▷
Once the press machine creates the press force, it automatically
completes pressing from this point until the entire press stroke
has been carried out.
▶
After full retraction of the roller head, open the press jaw and loosen
it from the press connector.
If a malfunction occurs and the press machine fails to
complete the pressing, press the Reset button to return
the roller head to its initial position.
Then remove the incompletely pressed press connector
from the installation and use a new press connector.
3.6
Aborting the pressing process
A pressing can be interrupted in the following situations:
d
Handling
Pressgun 6 PlusPress machine with rechargeable battery and Bluetooth interface
26