Bridge terminals 3 and 4 using a switch or relay contact (potential-
free).
3.3.7
Flushing the system
After performing the leakage test, the system must be flushed according
to the valid regulations, see
„Regulations from section: Flushing the
.
▶
Open the ball valve.
▶
Flush the water pipe section by means of the [Test flushing] func‐
tion.
For information on proper flushing in potable water installations, see
the applicable regulations under
Flushing the system“ on page 7
.
▶
Close the ball valve again.
▶
Open the screw fittings of the magnet valve.
▶
Check the sieve, clean or replace if necessary.
▶
Re-install the magnet valve with sieve and seals.
3.3.8
Performing a manual functionality test
Always perform a manual functionality test after comple‐
tion of the installation or rectifying a fault.
To start the functionality test, either press the button at the control of
the flushing station or execute the respective menu of the Web applica‐
tion.
The following components are queried:
n
Magnet valve
n
Backflow sensor
n
Multi-functional sensor (if enabled)
n
Flow sensor (if enabled)
n
Battery
Connecting the Acknowledge
button
"&
"&
3PVU 3JO "MPVU"M(/%
6
4DIBMUFS
Flushing
Description
Handling
Flushing station with Viega technology
34