Quick Start Guide: Shadow Premier 2U Application Servers
This sheet covers the installation of the Valerus Premier Application Servers 2U rack-mount form. This system
should only be installed by a qualified technician using common hand tools and approved materials in
accordance with the National Electrical Code ANSI/NFPA 70, state and local wiring codes.
Unpacking and Installation
Unpack the unit and place it in the mounting location. Hard drives are preinstalled from the factory.
•
Keyboard and mouse are included with the unit.
•
Connect monitor(s) using the DP and/or HDMI port (refer to figures above). DP to HDMI adapters are
provided as needed.
•
Connect device to the network using the WAN (Internet) port. Refer to figure above. The port is setup to
procure an IP address automatically using DHCP.
•
Attach the power cord and power the unit on. It is recommended to use an Uninterrupted Power Supply
(UPS) to prevent data loss/corruption and/or drive failures due to sudden power loss.
VICON INDUSTRIES INC. TEL: 631-952-2288 FAX: 631-951-2288 TOLL FREE: 800-645-9116
24-Hour Technical Support: 800-34-VICON (800-348-4266) UK: +44 (0) 1489 566300 WEB: vicon-security.com
Vicon part number
8009-8325-25-01
Product specifications subject to change without notice. Copyright ©2022. All rights reserved.
Vicon and its logo are registered trademarks and Valerus and its logo are trademarks of Vicon Industries Inc.
Front Panel Connections & Controls
Rear Panel Connections & Controls