To be done before spreading
85
Full field spreading
pattern test
If the spreader is correctly set and the tramlines are set at the correct
distance from each other you would achieve a good distribution of
fertiliser over the land. This will only be achieved if the spreader
spreads with the correct spreading pattern.
This is then the reason why you have to test the spreading pattern and
adjust it as required.
→
See also paragraph »Full field spreading pattern« on page 28.
I
NDICATION
Always perform a calibration test first and determine the correct
dosing setting before checking the spreading pattern. Changes to the
dosing setting will also have an influence on the spreading pattern!
→
See paragraph »Calibration test« on page 75.
Operation
Switch the tractor off, remove the key from the ignition and engage
the parking brake of the tractor.
Set the spreader in accordance with the spreading chart for the
desired working width (X meter)
(height of the spreading disc =
75 cm above the troughs)
.
Place the grids in the troughs.
Place trough 1 in the middle of the tractor tracks.
I
NDICATION
Position the troughs horizontally with a spirit level!
Divide the additional 6 buckets on the one side of the track over the
actual working width of the spreader.
The actual width is twice the size of the effective working width!
If you want to spread over a working width of 18 meters, place the
buckets at 18/6 meters = 3 meters.
Set the PTO shaft to 540 rpm
Drive along the tracks and open the dosing units a few metres
before you drive over the first bucket in the middle.
X m
(X ft)
X/6 m (ft)
X/6 m (ft)
X/6 m (ft)
X/6 m (ft)
X/6 m (ft)
X/6 m (ft)
Содержание RO-C 1400
Страница 4: ...Table of contents 4...
Страница 139: ...Maintenance 139 109 mm Rope Discharge bushing Position V Mechanical...
Страница 153: ...Notes 153 Notes...