Use in the field
100
Last setting check
A check list is given below, as well as in the jacket of the spreading
chart.
Do this last check to ensure good spreading results.
Are you working with the correct settings from the correct
spreading chart, based on:
•
distribution,
•
similar weight,
•
type of fertiliser,
•
desired working width,
•
desired driving speed?
Did you set the spreader in the correct way?
Did you:
•
set the height over the ground or crops to 75 cm?
•
is the spreader set horizontally at 5º or 8 º?
•
are the correct length vanes mounted?
•
is the correct number of dosing holes opened? (fine application)?
•
is the correct discharge point set?
•
is the correct dosing set?
•
is the border spreading plate in the transport (or working) setting?
Did you check the following settings:
Did you:
•
check the dosing setting with a calibration test?
•
perform a tray test to check the spreading pattern?
Work in the correct manner:
•
Did you set the correct PTO shaft rpm?
•
Are you driving at the correct driving speed?
•
Did you set the tramlines at the correct distance?
•
Wind speed too high?
Содержание RO-C 1400
Страница 4: ...Table of contents 4...
Страница 139: ...Maintenance 139 109 mm Rope Discharge bushing Position V Mechanical...
Страница 153: ...Notes 153 Notes...