![Vicon Andex 844 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/vicon/andex-844/andex-844_assembly-instructions-manual_1012854018.webp)
Crate packaging
18
Fitting the main
frame
Screw both parts of the main frame together at the flange piece.
Please note: First guide the inside hydraulic and electrical lines
through the openings in the flange pieces of the two main frames. Use
the internal assembly cable for the electrical line.
Raise the rear main frame with lifting accessories and secure
under the flange piece with stand.
Raise the front main frame with lifting accessories and secure.
Put both frame parts close together and secure.
First thread the electrical lines (lighting cables) from the front to the
rear through the front main frame. Then connect to the existing
assembly cable and pull through the rear frame.
Remove the hydraulic line ball valves.
Pull the hydraulic lines from the rear through the front main frame.
Fit the hydraulic line ball valves.
Guide both frame parts together at the flange pieces.
Using 4 bolts, loosely connect the flange pieces from the front and
rear main frames.
Secure the flange pieces using 2 clamping sleeves (torsion-free).
Fit the tine cover holder and insert the bolts.
Insert the remaining bolts.
Connect the flange pieces using all 12 bolts (torsion-free) (290
Nm).
Rear main frame
Front main frame
Clamping sleeve
Flange piece
No.
Quantity
Part
1
1
Rear main frame
2
1
Front main frame
3
Tine cover stowage compartments
4
12
M 16 x 60 bolts
5
12
M 16 nuts
6
24
M 16 washers
7
2
21 x 26 clamping sleeves
Содержание Andex 844
Страница 4: ...Table of contents 4 ...