Final tasks
37
Final tasks
Environment
•
Dispose of packaging according to the current local waste disposal
guidelines.
•
Ensure that lubricants are handled and disposed of correctly.
Checking
When fitting is completed, check the following:
Check all the bolts with a torque wrench (see table).
Tighten all T-bolts.
Tighten the hydraulic connections.
Route the hydraulic hoses and cables safely.
Insert the cable connectors securely.
PTO shaft connections engaged.
Check the lighting equipment.
Check the air pressure (1.5 bar).
Trial run
To fill the hydraulic system requires about 3 litres of hydraulic oil (SAE
90 API GL4).
Operate all hydraulic functions of the machine ten times to their
end stops, in order to remove any air from the system.
Upon completion of the trial run, check the hydraulic system for
leaks.
No persons within the slewing range
There is an extreme risk of injury within the slewing range from
slewing or folding machine parts. Serious or fatal injury may be
caused as a result.