Copyright © VibroSystM Inc., 2010
24
LIN-300 Protection Boxes_Installation - Rev. 0
O
The installation of the LIN-300 metal protection box involves three main steps:
1. Preparing the holes for the connectors and grounding assembly;
2. Fastening the protection box;
3. Grounding the protection box.
3.2.5 Preparing the holes for the liquidtight connectors and grounding assembly
1. As a precaution before drilling the
protection box, remove the mounting panel
to prevent metal particles infiltration. Do not
misplace the anti-vibration rubber mounts
added to the mounting panel assembly.
Figure 13 : Removing the mounting panel and anti-vibration mounts
Содержание LIN-300 Series
Страница 2: ...Copyright VibroSystM Inc 2010 2 PCS 200ESB with LIN 304S LIN 306S_Intsallation_Contents_Rev 1 O...
Страница 30: ...Copyright VibroSystM Inc 2010 30 LIN 300 Protection Boxes_Installation Rev 0 O...
Страница 40: ...Copyright VibroSystM Inc 2010 40 LIN 304S and LIN 306S Specifications_Rev 1 O...