6-1 INSTALLATION OF BATTERY OPTION
(1) Remove the case referring to 5-1
(2) Plug AJ battery cord to CN5 on AJDP board.
(3) Install AJ battery Holder Assy.
SECTION 6 INSTALLATION OPTIONS
(4) Cover the scale and stick the battery label above power jack
on the rear panel.
Battery label
AJBT Assy
AJDP board
PARTS LIST
6-1-1 AJ-220〜1200
30
All manuals and user guides at all-guides.com
Содержание AJ Series
Страница 1: ...AJ H Series Service Manual All manuals and user guides at all guides com a l l g u i d e s c o m ...
Страница 11: ...2 AJH Type 9 All manuals and user guides at all guides com a l l g u i d e s c o m ...
Страница 17: ...3 How to call address mode How to re write address data M M 15 All manuals and user guides at all guides com ...
Страница 18: ...4 6 LINEARITY ADJUSTMENT 1 How to adjust Linearity 16 All manuals and user guides at all guides com ...
Страница 35: ...33 All manuals and user guides at all guides com ...
Страница 36: ... 7 2 AJ 2200 12K 34 All manuals and user guides at all guides com a l l g u i d e s c o m ...
Страница 37: ...35 All manuals and user guides at all guides com ...