OLP-85/OLP-85P
35
C
REATING
A
NEW
PROJECT
5 M
ANAGING
P
ROJECTS
5
M
ANAGING
P
ROJECTS
Stored Measurements are assigned to a project. Therefore a
project first has to be created and set to active. As factory setting
one Test-Tool project named default is available, which can be
edited but not deleted. New projects can be created by copying
and changing an existing project or by creating a new one.
With the project some basic information like the project name, a
description of the project and how the label is build can be
saved.
Fig. 9
Project assignments
Creating a new project
1.
Press the
[
C
]
key, select
and tap
[
Projects
]
.
The Projects list opens. As factory setting only the Test-Tool
project default is available.
Fig. 10 Projects list with default project.