56
MPOLx-84/85 (P)
6 L
OSS
/L
ENGTH
T
EST
O
PERATION
R
EFERENCING
AND
RUNNING
A
TEST
WITH
24
FIBER
CABLING
The connection icon (1) shows if source and power meter are
linked properly.
2.
To start the test tap the start button (2)
– or –
Press the
[
A
]
key and tap the
[
Auto Test
]
button.
The display informs about the progress.
3.
“Viewing test results” on page 60
Referencing and running a test with 24 fiber
cabling
24 fiber cabling can be referenced and tested in two steps with
12 fibers at a time by using the optional available Y-adapters.
Please note that the measurement of the 12 fibers must always
follow directly after referencing. Since the procedures for
referencing and testing are identical to 12 fiber cabling, this
section only describes how to connect the Y-adapters and to
perform the referencing measurement procedure.
NOTE:
For 24 fiber cabling always select the test reference method
“3-cord”.
• For referencing details, see
Referencing and testing the first 12 fibers
1.
Follow the steps 1. and 2. explained in
1
2
Содержание SmartClass MPOLP-85
Страница 113: ...MPOLx 84 85 P 113 PRODUCT REGULATORY COMPLIANCE ...
Страница 114: ...MPOLx 84 85 P 114 PRODUCT REGULATORY COMPLIANCE ...